CMC has successfully completed and received full occupancy for our second project at Eastern Ice in Fall River, MA. The 25,000 square foot freezer and refrigerated dock expansion project was a resounding success that finished on time and on budget.
The refrigeration upgrades and multi-zoned freezer has given Eastern Ice the flexibility to utilize their space in a number of different ways. The design of the facility included numerous upgrades to the building envelope, mechanical systems and equipment that will reduce utility consumption and qualified for over $250,000 in incentives through National Grid’s Design 2000plus program. Eastern Ice is fully utilizing their new space for ice storage and contract freezing.