Greencore Group

Ready-to-Eat Facility Renovation

CMC Design-Build provided master planning, design, and construction services for the renovation of Greencore USA’s ready-to-eat foods manufacturing facility in Newburyport, MA.

The 30,000 SF renovation project required extensive planning and coordination with both the USDA and plant management to develop construction sequencing that would allow for minimal disruption to the daily operation of the plant.

The scope of work included the replacement of concrete floors and resin flooring, installation of segregated high care/low care drainage systems, replacement of walls, ceilings and doors, the upgrading of utilities including new fixtures, and the installation of new refrigeration and dehumidification systems. CMC also installed new production equipment and assembly lines.